Tuesday, June 14, 2011

Garden Update

We spent the afternoon yesterday in the garden. We weeded and then mulched the rest of the beds with saw dust. Hope that’s a good mulch. It seems to keep the weeds down and keep the soil moist. The lettuce has thrived. We’re using all open pollinated varieties this year (also known as heirloom). In other words, no hybrids, so we can attempt to save our seeds for next year.

IMG_2457

IMG_2454

 

 

 

 

 

 

Our green beans (Bush Blue Lake 274) are doing ok. They’re getting hammered by little grass hoppers, but seem to be growing enough to keep up with it. So far, we haven’t been bothered by critters and we have no fence.

You’ll notice we planted some beans right on the hay as an experiment. They aren’t doing nearly as well. I guess seeds prefer soil over hay.

 IMG_2459 IMG_2453

 

 

 

 

 

 

The Paris Island Cos (romaine) and Tom Thumb lettuce are doing well. Cabbage is questionable. Probably getting too hot.

IMG_2452

IMG_2458

 

 

 

 

 

 

As you can see on the top right and the left, we had our first two squash (Dark Green Zucchini and Early Prolific Straightneck) casualties due to cut worms. I remembered a trick used by some to prevent further damage. We pushed old nails down around the stems of the remaining squash to try and prevent future cut worm incidents. I really hope we get some squash.

IMG_2455

IMG_2456

 

 

 

 

 

 

What a difference a little thinning and mulch make. Here are the beets (Detroit Dark Red) before and after. I’m disappointed in the beets. As you can see, some parts of the rows just didn’t come in very well. Not sure if this was a soil nutrient issue, a pest, or some kind of disease. It’s a start.

We used the thinnings from the lettuce and beets for dinner last night. Just washed them and tossed them together. Connie made a simple dressing of equal parts sugar, vinegar, and oil, with a little garlic salt and salt. We threw in some craisins and it was good. Talk about fresh and nutritious.

Gardening has been and will again become our main focus.

Monday, June 13, 2011

Catching Up

A lot has happened recently that I wanted to catch up on. These might be out of sequence from the installing the door previous entry, but it represented some big steps.

 

I couldn’t resist putting in this video clip of Connie diligently working on nailing on the 30# roofing felt we used as window flashing. She is persistent, and a great worker. (She finally got the nail in on the second try). In all fairness, she was nailing in a difficult location.

IMG_2357

IMG_2429

 

 

 

 

 

 

We put in all the windows, along with to PTAC unit sleeves below two of the windows. We had these on hand and so we’ll use them as air conditioning and backup electric heat. (Actually, it will be our primary source of heat this winter and until I finish the masonry furnace.)

We then decided to put house wrap on the two gable ends to help protect the OSB sheathing (wafer board), since it will still be some weeks before we start the exterior siding.

IMG_2430

IMG_2432

 

 

 

 

 

 

 

 

Then we installed the shower unit in the bathroom. It went in well. I marked and cut out an access hole under the drain, installed the drain, then screwed in the fiberglass shower unit. I pre-drilled holes in the nailing fins first. It was a good thing I got the shower unit early on, before I finished the interior framing. And it was a good thing I waited to build the last little wall next to the shower. It would have been really heard if I had tried to install it after all this was done.

IMG_2359

IMG_2360

 

 

 

 

 

 

I also fixed the mower. This is now our only mower, having sold my big honkin’ Gravely zero-turn mower. We started out with just dirt around here, but surprisingly, a lot of grass has grown everywhere the land was cleared, except where we laid down rock and gravel. So, this is needed to try and keep ahead of the nearest grassy areas. Anyway, the shroud had broken and I used my rudimentary gas welding skills to fix it. Not pretty, but it held. The mower had just been sitting out for over a year. It started on the first pull (yes, it’s got a Honda engine), but then died because the air filter was plugged. Once I used it for a bit, it worked like a charm.

IMG_2426

 

We had a visitor behind our house. I think this is a snapping turtle. He wouldn’t answer my questions and I didn’t want to get to close to force the issue. I think he was heading for our pond. Maybe he can keep the other critters in line.

 

 

 

IMG_2412

IMG_2415

 

 

 

 

 

 

Finally, a garden update. Things are growing. I think I have some black rot on my grapes, according to a neighbor who runs an organic vineyard. But for the first year, I’m pleased.

IMG_2417

 

Here’s saying goodbye for now. This was taken a few days ago looking out our trailer door to our driveway. A good almost-summer shot.

 

 

 

 

And here’s a current picture of the house as it now stands:

IMG_2400

Installing the Front Door

Thought I would show the step by step process of hanging an exterior door, at least it’s the way I do it, which may not be the fastest (certain of that), but it works. WARNING! May be boring!

IMG_2349

IMG_2348

 

 

 

 

 

 

Preparation is the key. I’ve seen (and have had to repair) too many door thresholds that had rotted out, along with the framing below it. I made sill pans from aluminum flashing. Since I can’t afford a proper metal brake, I bought a vice grip tool with extra flat and wide jaws to work with sheet metal. These were attached with roofing nails along the edges of the ends that fold up onto the rough opening sides. The sub sill itself holds the pan in place.

IMG_2353

IMG_2356

 

 

 

 

 

 

Here’s the sill pan and sub sill installed and then painted. It’s very important that this sub sill is level. If not, shim it before securing it. I just used my nail gun with 16 penny framing nails, but made sure I only nailed it under where the door sill would rest so they are hidden from view and from moisture.

Note that this is not how doors are usually put in these days. Usually, the walls are only built with 2x4’s or 2x6’s and so you can just set the pre-hung door into the opening without any sub sill. However, due to my wide walls (about 10-1/4” thick), I had to go this route because I couldn’t get pre-hung sills and jambs wide enough. But actually, this is a lot sturdier and water resistant. (Of course, it is overbuilt. Big surprise.)

IMG_2362

IMG_2363

 

 

 

 

 

 

The rough opening ready for the door and the door ready to be installed. For this 36” door, the rough opening was supposed to be 38-1/2” wide and the standard 82-1/2” high. I think I ended up with a little narrower than that, but that’s ok.

IMG_2365

IMG_2366

 

 

 

 

 

 

Before lifting the door, lay it exterior side up and remove the nails (usually two of them) used to hold the door in place during shipping. To help locate the door 1/2” in from the framing to match the sheet rock, I installed two boards on the door face.

IMG_2367

IMG_2373

 

 

 

 

 

 

Like so. These, along with 1/2” spacer installed on the framing itself (see below) will hold the door plumb with the wall and exactly 1/2” out so the sheetrock ends flush with the door frame. Before lifting the door in place, run several beads of silicon (not latex) caulk on the bottom of the threshold provided.  IMG_2369IMG_2374 

 

 

 

 

 

 

Lift the door into place and install the spacers I mentioned above.

IMG_2376

IMG_2380

 

 

 

 

 

 

Notice how the interior door jamb rests 1/2” in from the framing. Also notice my extra-special helper making sure that door doesn’t run away.

 

IMG_2377

IMG_2378

 

 

 

 

 

 

From the outside (exterior) plumb the hinge side of the frame. If done correctly, the only two surfaces that need to be checked for level and plumb are the sub sill and the hinge jamb. If the door itself is warped (as many are that come from the big box stores), take it back. It will never work right.

Place a shim, one from the inside (this is where your helper comes in handy) and one from the outside. Place this first shim just at the top of the top hinge. Nail a galvanized casing nail through the jamb and into the framing. I usually nail it just above the shim. Every time I try and nail through the shim, it splits it. 

IMG_2382

IMG_2385

 

 

 

 

 

 

 

 

Repeat this, making sure the hinge side of the jamb is plumb (up and down) with shims at the top edge of the middle and bottom hinges. At this point, the door is secure. I then go inside and remove the bracing and check the gap between the door itself and the jamb to ensure it still looks even. Then, I get the great satisfaction of opening the door and having it close easily, without binding, etc.

IMG_2383

IMG_2390

 

 

 

 

 

 

Next, go back outside (it’s easy now that you can open the door) and shim and nail the latch side. Don’t force the shims, just put them in with enough force to stay in place until you nail above or below them. However, if the jam is bowed, this is a good time to straighten it up using the shims. Just follow the gap between the door and the jamb, as seen on the inside until it looks the same from top to bottom. I install three sets of shims on the latch side, with the middle one between the dead bolt and knob holes.

Then, from the outside, add additional shims on the bottom of each hinge and nail below these.

IMG_2388

IMG_2389 

 

 

 

 

 

Using a nail set, hammer in the nail heads to just below the surface of the jamb. These will be puttied later.

IMG_2391

IMG_2396

 

 

 

 

 

 

I’ve seen and used many approaches to removing the shim excess, from a utility knife (works pretty good if the blade is new), from a hand saw (I often dislodge the shims when I do it this way), to a wood chisel and hammer. If you have one of these Fein tools (they’re pretty pricey) or similar, its a breeze.

IMG_2397

IMG_2398

 

 

 

 

 

 

Now with the door installed, screw in the dead bolt and knob catch. Then, install the dead bolt and knob themselves. Now, if all went well, you can swing the door closed and it will latch on its own—a great feeling.

You can’t see it here, but I also installed a solid piece of wood between the jamb and rough framing so that the wood lies behind the dead bolt latch and extends down to the knob latch. This just gives more support and allows you to drill through the dead bolt latch hole so the throw will extend past the jamb into this extra piece of wood.

You’ll also note that I nail another set of nails on the inside of the jambs about in the same places as I first nailed the outer jamb. Set all these nail heads below the surface of the wood.

IMG_2399

IMG_2400

 

 

 

 

 

 

 

 

And here it is, installed. And here’s the “cottage” starting to look like a house.

IMG_2427

IMG_2424

 

 

 

 

 

 

After I installed the doors, I finished the sub sill by cutting a piece of 2x lumber to match the groove I cut in the first part of the sub sill and with the front edge sloping down and extending out to the sides beyond the door frame. These extensions will support and act to finish the door trim when installed. Notice the jamb extensions complete in the above pictures. These put the outer edge of the exterior jamb about an inch out from the house wrap. This is in anticipation of the 1” white oak siding I’ll be installing. The jambs will tie into these siding boards. Then, the 3/4” trim boards will cover the end of the jamb (except for an 1/8” reveal) and cover the jamb to siding joint, hopefully forming a water tight seal (after caulking the edges with latex caulk, of course).

There. That’s it. Now was that so boring? Don’t answer.